MyU | One Stop | Directories | U of M Home

Capital Planning and Project Management

About Capital Planning and Project Management

Home
 

About Capital Planning and Project Management

Introduction
Mission and Values
Active Projects

Completed Projects

Contact Information
 

University Customers

Request a Project Request a Project
Customer Forms
Project Phases
 Project Delivery Manual
Glossary of Terms
Capital Request
 
Service Providers
Vendor Information
 Consultant Proposal
 Forms and Contracts
 Construction  Standards
Master Planning
 
Administrative Resources
PIPS
Sustainability
Unifier
 
Administrative Resources
CPPM Intranet Intranet
Unifier Support

CPPM Home

 

  Home > Active Projects >Wind Energy Conversion System

Wind Energy Conversion System: Turbines Two & Three

Wind Turbine

Project Architect
HGA

Construction Manager at Risk
TBD

Total Square Footage:
2 - 262 ft. high towers with a 269 ft. rotar diameter.

Project Cost
$7.4 million

shim

The project is to erect and connect two Vestas V82 1.65 megawatt wind turbines, one at the Morris campus (UMM) and the other at West Central Research and Outreach Center (WCROC).  An existing wind turbine was installed at WCROC in 2005. It was the first large-scale wind research turbine at a U.S. public university and began generating power March 7, 2005.   The new turbine at UMM is being funded and supported by the University of Minnesota, Morris along with the Mille Lacs Band of Ojibway, and will be erected on the north side of campus and connected to the campus electrical distribution system via direct buried underground electrical feeder and communication lines.  Incongunction with the erection of the turbine at Morris, an electrical infrastructure upgrade of a high voltage switchgear will be installed to improve electrical power distribution.  The new turbine at WCROC will be located 1400 feet south of the existing turbine and will be connected to the existing wind turbine electrical distribution network.

Project Timeline

August 2009 Schematic Design Complete
November 2009 Construction Documents Complete
December 2009 Construction Begins
May 2010 Construction Complete
 

Current Construction Photos and Project Status

October 2009

 
Wind Turbine
shim
Click photo to enlarge.    
     
     
shim

Past Progress & Photos

  • Construction Photos
  • Status Progress Reports