Projects Recently Completed

Twin Cities Campus | East Bank
Both spaces are located on the First Floor of the Arena. In the strength training area, the project will renovate 6,700 square feet by opening the space for better coach sightlines to training regimens, re-organization of equipment to maximize space efficiency, the introduction of a shooting station (nonexistent today), and updated branding/finishes.

Twin Cities | East Bank
The project area comprises 3.2 acres in the residential Superblock on the Minneapolis East Bank Campus between Harvard and Oak Streets.

Twin Cities Campus | East Bank
The Recovery Suite will be created by renovating approximately 1,400 GSF of the existing second floor mezzanine in the Larson Football Performance Center within Athletes Village.

Twin Cities Campus | East Bank
This Project integrates several utility and roadway improvement needs into one coordinated design and construction effort.

Twin Cities Campus | East Bank
Renovations are proposed to the existing 7,000 gross square foot (gsf) volleyball area.

Morris Campus
All three levels of the Humanities Building will be affected by this renovation work for a total of 16,800 gsf.

Twin Cities Campus
The new facility will consist of 5,075 gross square feet (gsf) of office and support spaces.

Morris Campus
The Dowell Hall renovation comprises 10,100 gsf.

Morris Campus
The lower level of Blakely Hall will be affected by this renovation work, renovating 4,880 gsf.

Twin Cities Campus | St. Paul
This project will cosntruct three unique spaces designed for active learning.